Introduction to environmental impact assessment / (Record no. 5058)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 03763cam a2200253 a 4500 |
005 - DATE AND TIME OF LATEST TRANSACTION | |
control field | 20201123111043.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 110623s2012 enkab b 001 0 eng |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
ISBN | 9780415664684 |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
ISBN | 9780415664707 |
041 ## - LANGUAGE CODE | |
Language code of text/sound track or separate title | eng |
082 00 - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | 333.71/4 |
100 1# - MAIN ENTRY--AUTHOR NAME | |
Personal name | Glasson, John, |
245 10 - TITLE STATEMENT | |
Title | Introduction to environmental impact assessment / |
Statement of responsibility, etc | John Glasson, Riki Therivel and Andrew Chadwick. |
250 ## - EDITION STATEMENT | |
Edition statement | 4th ed. |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Place of publication | Milton Park, Abingdon, Oxon ; |
-- | New York : |
Name of publisher | Routledge, |
Year of publication | c2012. |
300 ## - PHYSICAL DESCRIPTION | |
Number of Pages | xviii, 392 p. |
490 0# - SERIES STATEMENT | |
Series statement | The natural and built environment series |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Part 1: Principles and procedures--<br/>1. Introduction and principles--<br/>1.1 Introduction--<br/>1.2 The nature of EIA--<br/>1.3 The purposes of EIA--<br/>1.4 Projects, environment and impacts--<br/>1.5 Changing perspectives on EIA--<br/>1.6 Current issues in EIA--<br/>1.7 An outline of subsequent parts and chapters; Some questions--<br/>2. Origins and development--<br/>2.1 Introduction. --<br/>2.2 The National Environmental Policy Act and subsequent US systems--<br/>2.3 The worldwide spread of EIA --<br/>2.4 Development in the UK--<br/>2.5 EC Directive 85/337--<br/>2.6 EC Directive 85/337, as amended by Directive 97/11/EC--<br/>2.7 An overview of EIA systems in the EU: divergent practice in a converging system--<br/>2.8 Continuing issues, review and refinement of the EIA Directive in EU-27--<br/>2.9 Summary; Some questions--<br/>3. UK agency and legislative context--<br/>3.1 Introduction--<br/>3.2 The principal actors--<br/>3.3 EIA regulations: an overview--<br/>3.4 The Town and Country Planning (EIA) Regulations 2011--<br/>3.5 Other EIA regulations--<br/>3.6 Summary and conclusions on changing legislation; Some question--<br/>2: Process--<br/>4. Starting up: early stages--<br/>4.1 Introduction--<br/>4.2 Managing the EIA process--<br/>4.3 Project screening: is an EIA needed?--<br/>4.4 Scoping: which impacts and issues to consider?--<br/>4.5 The consideration of alternatives--<br/>4.6 Understanding the project/development action--<br/>4.7 Establishing the environmental baseline--<br/>4.8 Impact identification--<br/>4.9 Summary; Some questions--<br/>5. Impact prediction, evaluation, mitigation and enhancement--<br/>5.1 Introduction.--<br/>5.2 Prediction--<br/>5.3 Evaluation--<br/>5.4 Mitigation and enhancement--<br/>5.5 Summary; Some questions--<br/>6. Participation, presentation and review--<br/>6.1 Introduction--<br/>6.2 Public consultation and participation--<br/> 6.3 Consultation with statutory consultees and other countries--<br/> 6.4 EIA presentation--<br/>6.5 Review of EISs--<br/>6.6 Decisions on projects--<br/>6.7 Summary; Some questions--<br/>7. Monitoring and auditing: after the decision--<br/>7.1 Introduction--<br/>7.2 The importance of monitoring and auditing in the EIA process--<br/>7.3 Monitoring in practice--<br/>7.4 Auditing in practice--<br/>7.5 A UK case study: monitoring and auditing the local socio-economic impacts of the Sizewell B PWR construction project--<br/>7.6 A UK case study: monitoring the local impacts of the London 2012 Olympics project--<br/>7.7 Summary; Some questions--<br/>Part 3: Practice--<br/>8. An overview of UK practice to date--<br/>8.1 Introduction--<br/>8.2 Number and type of EISs and projects--<br/>8.3 The pre-submission EIA process--<br/>8.4 EIS quality--<br/>8.5 The post-submission EIA process--<br/>8.6 Legal challenges--<br/>8.7 Costs and benefits of EIA--<br/>8.8 Summary; Some questions; Notes; References--<br/>9. Case studies of EIA in practice--<br/>9.1 Introduction.<br/>10.Comparative practice --<br/>Part - 4 Prospect--<br/>11.Widening the scope strategic environment assessment --<br/>12.Improving the effectiveness of project assessment. |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical Term | Environmental impact analysis |
Geographic subdivision | Great Britain. |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical Term | Environmental impact analysis. |
700 1# - ADDED ENTRY--PERSONAL NAME | |
Personal name | Therivel, Riki, |
Dates associated with a name | 1960- |
700 1# - ADDED ENTRY--PERSONAL NAME | |
Personal name | Chadwick, Andrew, |
Dates associated with a name | 1960- |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Koha item type | Books |
Lost status | Damaged status | Collection code | Home library | Current library | Shelving location | Date acquired | Source of acquisition | Full call number | Accession Number | Copy number | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|
Non Fiction | Library, SPAB | Library, SPAB | F-1 | 02/08/2016 | 006787333.714 GLA-I 00000334 20130809 C-6792 20130827 BARODA GBP00003499 SPAB/LIB/2009-10/B | 333.714 GLA-I | 006787 | Cop. 1 | Books | ||
Non Fiction | Library, SPAB | Library, SPAB | F-1 | 13/02/2014 | SPAB/LIB/2013-14/B444 | 2013-12-30 | NM/2013/CRB/1057 | 2014-01-14 | Bhopal | Lyall|GBP32.99 | Rs3536.53 | 333.714 GLA-I | 007617 | Cop. 2 | Books |