Professional practice of architectural working drawings / (Record no. 4924)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 07765nam a2200229Ia 4500 |
005 - DATE AND TIME OF LATEST TRANSACTION | |
control field | 20200220123749.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 160802s9999 xx 000 0 und d |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
ISBN | 9780470618158 |
041 ## - LANGUAGE CODE | |
Language code of text/sound track or separate title | eng |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | 720.284 |
Item number | WAK-P |
100 ## - MAIN ENTRY--AUTHOR NAME | |
Personal name | Wakita, Osamu A. |
245 ## - TITLE STATEMENT | |
Title | Professional practice of architectural working drawings / |
Statement of responsibility, etc | Osamu A Wakita, Nagy R Bakhoum and Richard M Linde |
250 ## - EDITION STATEMENT | |
Edition statement | 4th ed. |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Name of publisher | John Wiley, |
Year of publication | 2012. |
Place of publication | New Jersey : |
300 ## - PHYSICAL DESCRIPTION | |
Number of Pages | xiv, 658 p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | PART I PROFESSIONAL FOUNDATIONS --<br/>1 Chapter.1 The Office --<br/> The Physical Office --<br/> Office Practice and How It May Be Structured --<br/> Resource Library ---<br/> Professional Organizations --<br/>Architect/Client Relationship --<br/> Implementation of the Construction Documents --<br/> Building --<br/> Influence of Building Information Modeling on Building Design --<br/> Chapter 2 Standards and Techniques, Metrification, Hand Drafting, and Computer-aided Drafting --<br/> Introduction to Standards and Techniques --<br/> Drawing Practice --<br/> Lettering --<br/> Architectural Drafting ---<br/> Reproduction Methods --<br/> Office Standards --<br/> Metrics --<br/> Hand Drawing --<br/> Kinds of Drafting Equipment --<br/> Selecting and Using Drafting Pencils --<br/> Computer Drafting 49 Office Standards --<br/> A Game within a Game --<br/> Power of the CAD Drafter --<br/> Disadvantages of a Computer --<br/> Advantages of a Computer --<br/> Future of CAD 75 Conclusion ---<br/> Chapter.3 BIM, Revit, and Human Concerns --<br/> Introduction ---<br/> Human Considerations --<br/> Americans with Disabilities Act (ADA) --<br/>Building Information Modeling (BIM) --<br/> Chapter.4 Sustainable/Green Architecture --<br/> Environmental and Human Considerations --<br/> Sustainable Architecture --<br/> Lateral Influences --<br/>Energy Conservation --<br/> Sound --<br/> Snow --<br/> Fire and Smoke --<br/> Temperature --<br/> Deterioration --<br/> Drainage/Rainfall --<br/> Underground Gas Control --<br/> Water Table --<br/> Frost Line/Frost Depth --<br/> Termites and Termite Treatment --<br/> Energy Sources ---<br/> Future of Energy Sources --<br/> Chapter.5 Construction Materials and Methods --<br/> Building Materials --<br/> Wood Floor Systems --<br/> Wood Wall Systems ---<br/> Wood Roof Systems --<br/> Concrete --<br/> Steel Floor System ---<br/> Steel Stud Wall Framing System --<br/> Steel Decking Roof System ---<br/> Light Steel Roof Framing System --<br/> Masonry Wall System ---<br/> Composite Systems and Combinations of Materials --<br/> Material Selections --<br/> Wood as a Material --<br/> Concrete as a Material --<br/> Steel as a Material --<br/> Masonry as a Material --<br/> Chapter.6 Initial Preparation Phase for Construction Documents --<br/> Working Guidelines for Preparing Construction Documents --<br/> Making the Transition from Schematic Drawings to Construction Documents --<br/> Building Code Requirements-- <br/> Primary Materials Analysis --<br/> Selecting the Primary Structural System --<br/> Requirements of Consultants --<br/> Regional Considerations --<br/> Energy Conservation --<br/>Interrelationship of Drawings --<br/> Project Management --<br/> Office Procedure and Planning Strategy --<br/> Tracking a Set of Working Drawings --<br/> Format/Cartoon --<br/>Project Book --<br/> Numbers-Legal, Job, Task --<br/>Drawing Sequence --<br/> Delivery Methods --<br/> Part II DOCUMENT EVOLUTION --<br/> Chapter.7 Site and Grading Plan --<br/> Site Analysis --<br/> Site Analysis Applied --<br/> The Topography Map --<br/> The Soils and Geology Map --<br/> The Site Plan --<br/> The Grading Plan ---<br/> The Site and Grading Plan --<br/> The Drainage Plan --<br/> The Erosion and Sediment Control Plans --<br/> The Utility Plan --<br/> The Circulation Plan --<br/> The Landscape, Irrigation, and Drainage Plans --<br/> The Site Improvemet Plan: An Overview --<br/> Size and Location --<br/> Chapter.8 Floor Plan --<br/> Types of Floor Plans --<br/> Symbols --<br/> Other Floor-plan Considerations --<br/> Drawing a Floor Plan with a Computer --<br/> Chapter.9 Foundation and Roof Plans, Floor and Roof Framing Systems --<br/> Foundation Introduction --<br/>Types of Foundations --<br/> Examples --<br/> Summary of Typical Conventions for Foundation Plan --<br/> Exterior and Interior Walls --<br/> A Steel Structure --<br/> Roof Plans and Framing Systems-- <br/> Framing with Diferent Materials --<br/> Floor Framing --<br/> Chapter.10 Building Sections --<br/> Building Sections Defined --<br/> Drawing a Building Section --<br/> Types of Building Sections --<br/> Drafting a Building Section --<br/> Drafting a Building Section of a Residence --<br/> Chapter.11 Exterior and Interior Elevations --<br/> Introduction to Exterior Elevations --<br/> Drawing Doors and Windows --<br/> Material Designations --<br/> Notes --<br/> Dotted Lines --<br/> Controlling Factors --<br/> Drafting an Exterior Elevation --<br/> Weatherproofing --<br/> Drawing an Elevation with and without a Model --<br/> Exterior Elevation Using BIM/Revit --<br/> Interior Elevations --<br/> Dimensions and Intersections --<br/> Drafting an Interior Elevation: Examples --<br/> Computers and Interior Elevations --<br/> Evolution of a Set of Interior Elevations --<br/> Interior Elevations Using BIM/Revit --<br/> Chapter.12 Schedules: Door, Window, and Finish --<br/>3 Schedules Defined --<br/> Tabulated Schedules: Doors and Windows-- <br/> Pictorial Schedules: Doors and Windows --<br/> Choosing a Tabulated or Pictorial Schedule --<br/> Interior Finish Schedules --<br/> Additional Schedules --<br/>Schedules as They Relate to Structural Entities --<br/> CAD-Generated and Computer-Drafted Schedules --<br/> Schedule Templates --<br/> Schedules Using BIM or Revit --<br/> Chapter.13 Architectural Details and Vertical Links (Stairs/Elevators) --<br/> The Purpose of Architectural Details --<br/> Freehand Detail Sketches --<br/> Using Details in Construction Documents --<br/> Hard-Line (Hand-Drafted and CAD) --<br/> Footing Detail --<br/> Window Detail --<br/> Fireplace --<br/> Stair Design and Vertical Links --<br/> Mechanical Vertical Link --<br/> Detailing in BIM/Revit --<br/> Tenant Improvement Details --<br/> Part III CASE STUDIES --<br/> Chapter.14 Construction Documents for a One-story, Conventional Wood-framed Residence --<br/> Conceptual Design --<br/> Design and Schematic Drawings 463 Evolution of the Working Drawings --<br/> Site Plan, Vicinity Map, Roof Plan, and Notes --<br/> Jadyn Residence Site Plan --<br/> Jadyn Residence Floor Plan --<br/>Jadyn Residence Roof Plan --<br/>Jadyn Residence Building Sections --<br/>Jadyn Residence Exterior Elevations-- <br/>Jadyn Residence Foundation Plan --<br/>Framing a Residence --<br/>Jadyn Residence Roof Framing Plan --<br/> Jadyn Residence Interior Elevations --<br/>Set Check --<br/>Chapter.15 Construction Documents for a Two-story, Wood-framed Residence with Basement --<br/>Schematic Design for Blu Residence --<br/>Site Plan --<br/>First-Floor Plan --<br/>Second-Floor Plan --<br/>Roof Plan --<br/>Blu Residence Building Sections --<br/>Blu Residence Building Elevations --<br/>Foundation Plan: Slab and Raised Wood --<br/>Blu Residence Foundation Plan: Raised Wood --<br/>Framing Plan --<br/>Support Drawings for Blu Residence --<br/>Chapter.16 Conceptual Design and Construction Documents for a Steel and Masonry Building (Theater) --<br/>Introduction --<br/>Conceptual Design: Site and Client Requirements --<br/>Design Development Punch List --<br/>Initial Schematic Studies --<br/>Site Plan --<br/>Foundation Plan --<br/>Ground-Floor Plan --<br/>Partial Floor Plan and Interior Elevations --<br/>Exterior Elevations --<br/>Building Sections --<br/>Roof Plan --<br/>Roof Framing Plan --<br/>Chapter.17 Madison Steel Building --<br/>Introduction --<br/>The Madison Office Building --<br/>Floor-plan Design Development Phase --<br/> Summary --<br/> Chapter.18 Tenant Improvements --<br/>Tenant Improvement Introduction --<br/>Existing Buildings --<br/>Existing Floor Level-Building A --<br/>Development of Working Drawings-Building B --<br/>Working Drawings.<br/> |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical Term | Architecture |
General subdivision | designs and plans |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical Term | Architecture |
General subdivision | Designs and plans |
-- | Working drawings |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Bakhoum, Nagy R |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Linde, Richard M |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Koha item type | Books |
Lost status | Damaged status | Collection code | Home library | Current library | Shelving location | Date acquired | Source of acquisition | Full call number | Accession Number | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|
Non Fiction | Library, SPAB | Library, SPAB | I-2 | 26/09/2013 | SPAB/LIB/13-14/B347 | 2013-08-31 | C-6826 | 2013-08-31 | Baroda | USD114.95 | Rs7655.67 | 720.284 WAK-P | 006634 | Text/Reserve Book |